From incoming rates to a quote someone can review

At DNA Supply Chain Solutions, I built logistics quoting and rate-ingestion workflows in Mastery. My work connects incoming rate data, background processing, and the steps an operator uses to prepare a quote. As of October 2026, I estimate that approximately 30 employees use Mastery.

These workflows need more than a successful first run. A worker can stop partway through processing. A user can retry an action. A quote request can arrive while another attempt is still in progress. I worked on making those states explicit and recoverable.

Recovery example · an interrupted ingestion job
InterruptedA worker stops, leaving its job marked processing and locked.
ReclaimedAfter the old process stops, its replacement can reclaim that job using the same worker identity.
ProtectedA different worker must still wait for the stale-lock timeout.

This depends on stop-first replacement: the old and new consumers must not overlap under the same identity.

Recover abandoned work without ignoring active work

An interrupted ingestion job could remain locked until its timeout. I changed both job selection and the conditional claim to recognize work left by a stopped predecessor, so a replacement can recover it immediately. Queue contract tests cover reclaiming that work while preserving the timeout boundary for other workers.

Quote generation has a separate conflict problem. I added a transaction that locks the selected quote option, checks the requesting recovery session, and reserves the option before generation. A different recent active session is rejected. Tests cover successful reservation and rollback on a conflict; this protects the start of generation rather than promising exactly-once downstream effects.

Scale of the quoting workflow

A review of retained database records for July–September 2026 found 1,064 newly recorded quote numbers after known test and deleted-record exclusions: roughly 350 per month. The count uses the first appearance of each normalized quote number, rather than counting every saved version.

Production/test isolation is not fully confirmed. These are recorded quote numbers, not a count of customer-released quotes, bookings, or deliveries.